![]() AV – annular velocity or apparent viscosity.ASCSSV – annulus surface controlled sub-surface valve.ASTM – American Society for Testing and Materials.ASOG – activity-specific operating guidelines.ASME – American Society of Mechanical Engineers.APWD – annular pressure while drilling (tool).API – American Petroleum Institute: organization which sets unit standards in the oil and gas industry.AMS – auxiliary measurement service log auxiliary measurement sonde (temperature).ALLMS – anchor leg load monitoring system.ALC – vertical seismic profile acoustic log calibration report.ALARP – as low as reasonably practicable.ALAP – as low as possible (used along with density of mud).AL – appraisal license (United Kingdom), a type of onshore licence issued before 1996.AISI – American Iron and Steel Institute.AISC – American Institute of Steel Construction.AIPSM – asset integrity and process safety management.AIChemE – American Institute of Chemical Engineers.AICD – autonomous inflow control device.AHBDF – along hole (depth) below Derrick floor.AGT – (3) Azerbaijan – Georgia – Turkey (a region rich in oil related activity).AGT – (2) authorised gas tester (certified by OPITTO).AFE – Authorization for expenditure, a process of submitting a business proposal to investors.AEMO – Australian Energy Market Operator.ADM – Advanced diagnostics module (fieldbus).ADT – Applied drilling technology, ADT log.ADROC – advanced rock properties report.ADEP – Awaiting development with exploration potential, referring to an asset.ADE – Advanced decision-making environment.ABSA – Alberta Boilers Safety Association.ABAN – Abandonment, (also as AB and ABD and ABND).AAODC – American Association of Oilwell Drilling Contractors (obsolete superseded by IADC).AAPL – American Association of Professional Landmen.AAPG – American Association of Petroleum Geologists.AADE – American Association of Drilling Engineers.8rd – eight round (describes the number of revolutions per inch of pipe thread).4D – multiple 3Ds acquired over time (the 4th D) over the same area with the same parameters ( geophysics).3P – proved, probable and possible reserves.3C – Proved, probable and possible contingent resources.3C – three components seismic acquisition (x, y, and z).2oo3 – Two out of three voting (instrumentation).2oo2 – Two out of two voting (instrumentation).2C – Proved and probable contingent resources.1oo2 – One out of two voting (instrumentation).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |